亚洲国产精品国自产拍AV,无码少妇一区二区,国产精品午夜在线观看,久久久精品国产亚洲AV无码麻豆,中文字幕v亚洲日本,精品无码久久午夜福利,中文字幕在线视频第一页,最近更新免费中文字幕大全,久久久久国产一级毛片,精品综合久久久久久97

Chongqing XieCheng Metal Tools & Stamping Co., Ltd!
Your current location is:Home >> Chongqing Xicheng Hardware Manufacturing Co., Ltd. >> common problem
NEWS
Chongqing Xicheng Hardware Manufacturing Co., Ltd.
Landline:023-42466988
Mobile phone:15909303966
Address:No. 7, Gusheng Road, Caojie Industrial Park, Hechuan District, Chongqing
Website:m.chinacgzx.com
common problem
Common problems and solutions of hardware mold commissioning and maintenance
Release time:2023/2/20   Source:Chongqing Xicheng Hardware Manufacturing Co., Ltd.  Read:855Second
In the process of debugging and maintenance, moulds often encounter various problems, which will seriously affect the delivery date of products and the service life of moulds.

The purpose of mold debugging is to find out the problems in the mold design and manufacturing process, so as to improve and correct the process defects in the original design, processing and assembly, and produce qualified products. Through die test and adjustment, the forming conditions and process procedures without providing products can be obtained, and the die quality and accuracy can be verified as the basis for delivery and production.

Precautions before mold test

1. The performance, brand and thickness of the test material should meet the requirements of the drawing. In the actual operation, it is often found that the mold commissioning personnel have no product drawing in their hands. In the future commissioning process, this phenomenon should be avoided.

2. The mold must be carefully checked before commissioning to prevent some unrelated products and parts from attaching to the mold and prevent mold damage. The mold must be fastened on the stamping equipment, and then adjusted after inspection. The above two points should be prepared before the mold is adjusted.

Common defects and solutions in mold test

1. The product has large burr

Causes: 1. If the bright band on the shear surface of the product is too wide, or even there are two bright bands and extruded burrs sometimes, it means that the gap is too small. If the bright band on the shear surface of the product is too narrow, the tread angle is large, and the entire section has a large inclination, resulting in fracture burrs, it means that the gap is too large. At this time, the blanking gap should be readjusted. Such problems are less likely to occur when finishing parts.

The uneven gap between the male and female dies will also produce burrs, and the material after blanking can be judged according to the uniformity of the bright band on the shear surface. In the actual debugging process, the burr phenomenon should be solved before debugging. The above phenomena can be found in the process of mold assembly. The problem of burr can be solved if the accuracy of die assembly and reasonable clearance blanking can be guaranteed. In addition, in the process of mold assembly, the engineering personnel should carefully check whether the blanking hole is enough, whether there is any missing processing, whether there is enough part of the displacement and whether there is any missing place, and should try to avoid spending time and energy to solve similar problems in the process of mold debugging. This is the basic ability and quality that a qualified engineering personnel should have.

2. Chip jumping and crushing

This is a big problem in mold debugging, not only in mold debugging, but also in daily production.

The root cause of chip jumping is the adsorption force between the scrap and the punch, the friction force between the scrap and the die, and the gravity of the scrap. In particular, the thin sheet is slightly punched, and the friction force between the material retained in the die and the die is small, which is easy to cause the scrap to move up. The specific reasons are mainly as follows:

A. When the gap between the punch and the die is too large, it is easy to cause the scrap to move up

B. Because the straight section of the die is too smooth

C. The straight section of the die is too good, the stored waste is too much, and the downward friction increases

D. The scrap does not fall smoothly and touches the parts under the die edge, causing fertilizer blockage

E. During sheet blanking, the shape of the blanking waste is large and thin, which is tightly adsorbed under the punch

F. Use high viscosity lubricating oil, which will cause adhesion due to high adhesion

G. The concave die edge is too sharp

H. The position and function of the discharge plate are not appropriate, and the gap between the discharge plate and the peripheral surface of the punch is uneven

I. In the process of mold processing and stamping production, magnetism is generated on the punch and adsorption is generated

There are many ways to solve the problem of waste moving up. The common methods are as follows.

1. During mold debugging, each part in each template must be demagnetized

2. During design, try to avoid the punching method with too simple shape

3. Reduce the length of the straight end face of the female die

4. The working surface of the punch shall be made into a convex or concave shape

5. If the waste is relatively large and the shape of the waste is relatively simple, the straight end of the concave die should be processed symmetrically to make two grooves with a slope of about 20 °, a depth of 0.015mm and a width of 1-1.5mm.

4. Adjustment of bending angle

The adjustment of bending angle mainly includes right angle, acute angle and obtuse angle. It is necessary to distinguish whether there is R angle at the bending point. For the adjustment of bending without R angle, the concave die does not need to be a sharp angle, and R0.1 fillet can be allowed between the test dies. This is due to the fact that a small round corner will naturally appear at the concave die after a little longer time in mass production. The main purpose of mold debugging is not to produce several qualified samples, but to take into account some problems that may occur during mass production. In many cases, we feel that debugging the mold is to deal with the sample, but not fully consider the mass production. Many problems can be solved in the process of debugging, but often many seemingly simple problems are found in mass production. This leads to a non-virtuous cycle of debugging and reviewing while producing. For right-angle bending without R angle, the line pressing method is the simplest and most useful, and it is also very stable in the production process. The line pressing width should be determined according to the material thickness and strength. For sharp angle bending without R angle, the relative distance dislocation of the front and back bending lines can be used for debugging. When the bending line is higher than the bending line, the internal stress of the material is destroyed by pre-bending. The bending adopts the method of reverse core pulling and floating die. The relative distance of the bending position used for pre-bending and bending should be determined according to the thickness and strength of the material. For obtuse bending without R angle, the springback of bending should be considered at this time. The springback of stainless steel should be relatively large, while that of brass, red copper, tinplate and other materials should be relatively small.
 
Website of this article:http://m.chinacgzx.com/News_Show.asp?id=21
Previous: How to deal with the spr
Next: What are the advantages
24-hour hotline
023-42466988    15909303966
Email
cqxcwjgs123@163.com
Factory address
No. 7, Gusheng Road, Caojie Industrial Park, Hechuan District, Chongqing
About us
PRODUCTS
WeChat consultation
Copyright © Chongqing Xicheng Hardware Manufacturing Co., Ltd.
website:m.chinacgzx.com
ICP:YICPB No. 2022012834
Disclaimer: The text of this article is reproduced and the pictures are collected from the network. If there is any infringement, please inform us in time and we will delete it in the shortest time.
国产精品伦一区二区三级视频| 中文字幕在线免费看线人| 中文字幕久久波多野结衣av| 少妇愉情理伦片高潮日本| 亚洲国产精品网站在线播放| 91精品夜夜夜一区二区欲色| 亚洲精品无码专区久久久| 午夜无码免费福利视频网址| 国产精品久久毛片免播| 精品国产综合区久久久久久| 91精品人成在线观看| 国产成人精品月日本亚洲语音| 欧美爆乳大码在线观看| 日本免费高清视频二区| 国产成人久久久精品一区| 欧美精品v欧洲精品| 亚洲精品无码久久久影院相关影片| 久久久无码人妻精品无码| 欧美日韩午夜专区视频| 制服丝袜国产日韩一区| 成人动漫一区二区| 国产日韩欧美成人综合电影在线观看| 久久久国产成人一区二区三区| 三级a午夜电影在线观看| 一级做a爱无码性色永久免费| 亚洲成AV动漫人片在线观看无码| 波多野结衣AV一区二区三区中文| 日韩中文字幕推理片| 国产乱妇乱子在线播视频播放网站| 美丽人妻无套中出中文字幕 | 91香蕉亚洲精品人人影视| 99国产欧美久久久精品蜜桃| 国产日韩欧美另类制服丝袜| 国产成人无码AV一区二区三区| 国产成人精品日本亚洲| 国产午夜无码专区喷水| 98在线视频噜噜噜国产| 一本色道久久综合狠狠躁| 青娱乐极品盛宴国产一区在线观看| 14表妺好紧没带套经过| 美女胸又WWW又黄的视频|